|
DSpace@nitr >
National Institue of Technology- Rourkela >
Conference Papers >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/2080/437
|
Full metadata record
| DC Field | Value | Language |
| contributor.author | Mahapatra, S S | - |
| contributor.author | Sahu, Amit | - |
| date.accessioned | 2007-06-14T08:21:16Z | - |
| date.available | 2007-06-14T08:21:16Z | - |
| date.issued | 2006 | - |
| identifier.citation | Proceedings of the International Conference on Global Manufacturing and Innovation – July 27-29, 2006 | en |
| identifier.uri | http://hdl.handle.net/2080/437 | - |
| description | Copyright for this article belongs to the Proceedings Publisher | en |
| description.abstract | The successful enterprises deliver products and services in shorter throughput time and
turnover inventory as quickly as possible. Three important approaches to achieve these goals are
Materials Requirements Planning (MRPI, MRPII), Just-in-Time (JIT), and Theory of Constraints
(TOC). TOC seems to be a viable proposition because it does not require costly affair of system
change; rather it is simply based on scheduling of the capacity constraint resources. The scheduling
system of theory of constraints (TOC) is often referred as drum-buffer-rope (DBR) system. DBR
systems operate by developing a schedule for the system’s primary resource constraint. Based on
simulation of a flow shop operation considering non-free goods, this study suggests that the
performance of DBR results in lower in process inventory compared to conventional production
system. In addition, the behavior of the system when bottleneck shifts its position has been studied. A
methodology has been proposed using neural networks based on back propagation algorithm for
accurate prediction of throughput considering mean processing time, coefficient of variation, buffer
size, number of stations and signal buffer | en |
| format.extent | 248804 bytes | - |
| format.mimetype | application/pdf | - |
| language.iso | en | - |
| subject | TOC | en |
| subject | DBR | en |
| subject | Primary Resource Constraint | en |
| subject | Simulation | en |
| title | Application of Theory of Constraints on Scheduling of Drum-buffer-rope System | en |
| type | Article | en |
| Appears in Collections: | Conference Papers
|
Files in This Item:
| File |
Description |
Size | Format |
| GMP_15.pdf | | 242Kb | Adobe PDF | View/Open |
|
Show simple item record
All items in DSpace are protected by copyright, with all rights reserved.
|